
Epoxy Coating Systems
Commercial and industrial floor coatings
What epoxy coating systems actually involves
Commercial and industrial floors have to meet real requirements — chemical exposure, wash-down cycles, forklift traffic, thermal shock, or health department standards. We specify and install epoxy, urethane cement, and polyaspartic systems matched to how the space is actually used, including coved integral base and sloped-to-drain detailing where sanitation matters.
Every project starts the same way: we look at the property, establish what water is doing and where it is entering, and only then specify a system. That order matters — a correctly installed product solving the wrong problem still leaves you with a wet building.
Included in every epoxy coating systems project
- Self-leveling, mortar, and broadcast epoxy systems
- Urethane cement for thermal shock and wash-down areas
- Integral coved base for sanitary environments
- Chemical-resistant and static-dissipative options
- Slip-resistance rated to the working environment
- Fast-cure schedules that limit facility downtime
Four steps from first call to sign-off
Use-Case Review
We start with how the floor is used — traffic, chemicals, temperature, cleaning — before specifying.
Substrate Preparation
Shot blasting or grinding creates the profile the specified system needs to bond correctly.
System Build-Up
Primer, body coats, and top coats are installed at spec thickness with detailing at drains and base.
Cure & Turnover
The system cures to service, and we turn over care instructions with the finished floor.
The difference a properly built assembly makes
Waterproofing is buried work. Once the backfill, topping slab, or tile goes over it, nobody sees the detailing again — which is exactly why the details have to be right the first time.
Diagnosed First
We confirm where water is genuinely entering before specifying anything, so the work targets a cause rather than a symptom.
Matched to Conditions
Substrate, exposure, and water pressure decide the system. The same product is not right for every property.
Prepared Properly
Profiled, cleaned, moisture-tested surfaces. Preparation is where most failed waterproofing jobs actually went wrong.
Tested & Documented
Flood tests, electronic detection, and photo records so you have proof the assembly performs before it is covered up.
Detail-driven from start to finish
Durable waterproofing comes from disciplined habits, not premium product names. Here is the standard we hold ourselves to on every project.
A Written Scope
You get the system, the sequence, and the expected result in writing before work begins.
Substrate Preparation
Grinding, profiling, and repair to a sound surface — never a coating applied over unsound concrete.
Reinforced Detailing
Corners, drains, penetrations, and joints get reinforcement, because that is where assemblies fail.
Site Protection
Landscaping, hardscape, finishes, and adjacent surfaces are protected for the length of the project.
Verification Before Close-Out
Testing under real conditions, then a walkthrough so nothing gets buried on assumption.
Questions, answered
Related services
Under Tile Waterproofing
Membrane systems installed beneath tile
View Under Tile Waterproofing detailsBetween Slab Waterproofing
Protection sandwiched between structural pours
View Between Slab Waterproofing detailsPlanter Box & Block Wall Waterproofing
Sealing constantly wet retaining structures
View Planter Box & Block Wall Waterproofing detailsGet a free estimate for epoxy coating systems
Share a few details about the property and we will come back with clear next steps — usually the same business day.
