Skip to content

Waterproofing & Coatings

8%
Large-format tile being set over a waterproofing membrane on a prepared floor
Waterproofing Service

Under Tile Waterproofing

Membrane systems installed beneath tile

(209) 895-0406
Free Estimates
Bay Area Local
Leak Detection
Overview

What under tile waterproofing actually involves

Tile is water resistant. The substrate underneath it is not. Under tile waterproofing installs a bonded membrane between the slab and the tile assembly so that moisture passing through grout joints is stopped before it ever reaches the structure. We install sheet and liquid-applied systems on showers, balconies, terraces, kitchens, and interior wet areas, with reinforced treatment at every corner, drain, and change in plane.

Every project starts the same way: we look at the property, establish what water is doing and where it is entering, and only then specify a system. That order matters — a correctly installed product solving the wrong problem still leaves you with a wet building.

What's Included

Included in every under tile waterproofing project

  • Bonded sheet and liquid-applied membrane systems
  • Reinforced corners, curbs, and wall-to-floor transitions
  • Bonding flange and clamping ring drain integration
  • Correct slope-to-drain verified before tile is set
  • Flood testing prior to setting materials
  • Crack isolation over active substrate joints
Our Process

Four steps from first call to sign-off

01

Substrate Assessment

We evaluate the slab, existing slope, drain type, and moisture conditions before specifying a system.

02

Preparation & Priming

Surfaces are cleaned, profiled, and primed so the membrane bonds to sound substrate rather than dust or laitance.

03

Membrane Installation

The membrane is applied at spec thickness with reinforcing fabric at corners, drains, and transitions.

04

Flood Test & Handoff

The assembly is flood tested and documented, then released to the tile installer with confidence.

Why It Matters

The difference a properly built assembly makes

Waterproofing is buried work. Once the backfill, topping slab, or tile goes over it, nobody sees the detailing again — which is exactly why the details have to be right the first time.

Diagnosed First

We confirm where water is genuinely entering before specifying anything, so the work targets a cause rather than a symptom.

Matched to Conditions

Substrate, exposure, and water pressure decide the system. The same product is not right for every property.

Prepared Properly

Profiled, cleaned, moisture-tested surfaces. Preparation is where most failed waterproofing jobs actually went wrong.

Tested & Documented

Flood tests, electronic detection, and photo records so you have proof the assembly performs before it is covered up.

Our Standard

Detail-driven from start to finish

Durable waterproofing comes from disciplined habits, not premium product names. Here is the standard we hold ourselves to on every project.

A Written Scope

You get the system, the sequence, and the expected result in writing before work begins.

Substrate Preparation

Grinding, profiling, and repair to a sound surface — never a coating applied over unsound concrete.

Reinforced Detailing

Corners, drains, penetrations, and joints get reinforcement, because that is where assemblies fail.

Site Protection

Landscaping, hardscape, finishes, and adjacent surfaces are protected for the length of the project.

Verification Before Close-Out

Testing under real conditions, then a walkthrough so nothing gets buried on assumption.

FAQ

Questions, answered

Ready When You Are

Get a free estimate for under tile waterproofing

Share a few details about the property and we will come back with clear next steps — usually the same business day.

(209) 895-0406